Advanced Reporting – Scheduled Reports: Delete, Reset and Failure Details
You can now delete scheduled reports and reset suspended schedules, and see why a schedule failed.
- Delete: remove a schedule from the Scheduled Reports section of the Reports dashboard, after confirming. This requires the Reporting Delete permission.
- Reset: return a suspended schedule to Active, clearing its failure count and recalculating its next run. A one-time schedule needs a new run time at least 1 hour in the future. This requires the Reporting Edit permission.
- Failure details: the last failure reason and message are now shown in a tooltip on suspended schedules.
Permissions Impact
No permissions are impacted. Deleting scheduled reports uses the existing Reporting Delete permission, and resetting suspended schedules uses the existing Reporting Edit permission. No new permission is introduced and no existing permission is changed.
Since November 2026, creating, editing, pausing, resuming, resetting and deleting scheduled reports requires the Reporting Schedule Edit permission. See Advanced Reporting - Report Scheduling Permission and Access Layers.
User Guide Reference: Advanced Reporting in Fenergo — Suspended Schedules